Metro Tunnel Project
Around $2.8M of plant hire, drainage, civil, concrete and labour across multiple packages and clients.
PACC delivered approximately $2.8 million of work on the Metro Tunnel Project across multiple clients and packages.
Scope included plant hire, drainage, minor civil and concrete works, and skilled labour across day and night shifts. Notable packages included works at the Eastern Portal, MQT and Cross Passage 15.
- Client
- Multiple clients
- Value
- $2.8M
- Location
- Melbourne CBD
- Program
- Metro Tunnel Project
- Services
- Stormwater drainage, Civil works, Plant hire, Labour hire
Other work.
$2.5M Moonee Valley Racecourse
SymalA $2.5M lump sum stormwater drainage installation for Symal, at depths beyond six metres in a live racecourse environment.
Read the project
$1M West Gate Tunnel
CPB John Holland Joint VentureAbout $1 million of stormwater drainage at the Northern Portal, working directly for the CPB John Holland JV.
Read the project
$3M Union and Mont Albert
Various contractorsAbout $3 million of turnover across more than a year on the Union Road and Mont Albert Road level crossing removal, working for several contractors.
Read the project