We've already done the work.
224 project engagements and more than 147,000 field hours since November 2021, most of them for repeat clients. Here are some of them.
$2.5M Moonee Valley Racecourse
SymalA $2.5M lump sum stormwater drainage installation for Symal, at depths beyond six metres in a live racecourse environment.
Read the project
$1M West Gate Tunnel
CPB John Holland Joint VentureAbout $1 million of stormwater drainage at the Northern Portal, working directly for the CPB John Holland JV.
Read the project
$3M Union and Mont Albert
Various contractorsAbout $3 million of turnover across more than a year on the Union Road and Mont Albert Road level crossing removal, working for several contractors.
Read the project
$2.8M Metro Tunnel
Multiple clientsAround $2.8M of plant hire, drainage, civil, concrete and labour across multiple packages and clients.
Read the project
$2M+ SRL Clarinda
Keller VSL Joint Venture (KVJV)An FRP package for the pilot guide wall of the TBM launch box at Clarinda, valued at over $2 million, with Suburban Connect as the head contractor.
Read the project
$1.6M M80 Ring Road
CPB ContractorsA $1.6M direct subcontract for stormwater drainage and civil works beside live traffic.
Read the project
$2.6M St Huberts Winery
Long ContractingA $2.6M full package: bulk and detail earthworks, roads, paths, carparks and subcontractor management.
Read the project
$1.5M Drake Boulevard
Vaughan's ConstructionAbout $1.5 million of bulk earthworks and civil works at Drake Boulevard for Vaughan's Construction.
Read the projectNorth East Link
AVO PilingPlant and labour for the diaphragm wall team, running for more than 24 months across night shifts and occupations.
Read the project $300k+Whelans, Thompsons Road
WhelansA technically demanding drainage scope worth more than $300k for Whelans at Thompsons Road, Clyde North, in 2026.
Read the project $700kMedway Golf Club, Maidstone
Safety Focused Performance Joint Venture (SFPJV)$700k of hardstand works and plant hire at Maidstone for the Safety Focused Performance Joint Venture.
Read the project 2024Calder Park
SymalDrainage at the Calder Park truck stabling yard for Symal, with Degnan as the head contractor.
Read the project- Epping Road Upgrade
- $1.4M stormwater drainage package for McConnell Dowell
- Narre Warren to Cranbourne Road
- $1.7M drainage and stormwater package for McConnell Dowell
- Frankston Station
- Sheet piling works for L.U. Simon Builders
- Data centres
- Truganina, Craigieburn, Cobblebank and MEL04 with Keller, Symal, Gearon and Track Works
- CBD foundations
- Keller at Melbourne Quarter, Melbourne Square, West Side Place, Freshwater Tower, 555 Collins, 88 Queensbridge, Seafarers and North Wharf Docklands
- Earlier programs
- Eastlink, Peninsula Link and the Webb Dock Redevelopment
Level crossing removals
Since the flagship Bayswater removal in 2017 our crews have worked day shifts, weekend occupations and night shifts on more than 50 sites across metropolitan Melbourne.